Rytrans

Build Schedule

3 build bays · 8 builds booked · 1 finishing after the customer's date
Xero · synced 08:55 Demo 27 Oct 2026
iWhat each build bay has on, week by week. Drag a build to move it. Check a build answers whether another one fits — the next free bay, and whether the steel and parts are here in time.
Check a build
Looks at every bay that can take the model and the builds already in it, then checks each part on the model's BOM against what's free on the rack, what's on order and the supplier's lead time — steel and alloy are needed on day one, livestock fit-out at the body stage, running gear at fit-off.
Dozer Safety Mod PackRT-EMSM · 3 working days
Bay 3 · 30 Nov → 2 Dec
Finishes 3 working days after they want it (27 Nov 2026). Bay 3 is free from 30 Nov 2026.
Bay 3: 30 Nov → 2 Dec (+3 d)Bay 1: 9 Dec → 11 Dec (+10 d)Bay 2: 6 Jan → 8 Jan (+30 d)
9 of 9 BOM lines on the rack. Material $3,426.
All 9 BOM lines
PartNeedFreeOn orderStatus
Trailer wiring loom kit — 7-pin
EL-LOOM
120On the rack
LED crate work light
EL-WORK
4120On the rack
M16 HT bolt & nut — box of 50
FS-M16
1100On the rack
MIG wire 0.9 mm — 15 kg
CN-MIG09
1160On the rack
Zinc-rich primer — 20 L
PT-PRIMER
160On the rack
2-pack polyurethane topcoat — 20 L
PT-TOPCOAT
170On the rack
3 mm checker plate — 2400×1200
PL-CHK3
290On the rack
100×50×4.0 RHS — 8 m
ST-RHS10050
4220On the rack
50×50×3.0 SHS — 8 m
ST-SHS5050
6860On the rack