iWhat each build bay has on, week by week. Drag a build to move it. Check a build answers whether another one fits — the next free bay, and whether the steel and parts are here in time.
Bays, week by weekDrag a build left or right to move it, or onto another bay. Dashed line = customer's date.
Bay
19 Oct
26 Oct
2 Nov
9 Nov
16 Nov
23 Nov
30 Nov
7 Dec
14 Dec
21 Dec
28 Dec
4 Jan
11 Jan
18 Jan
25 Jan
1 Feb
Bay 1trailersfree 9 Dec
Bay 2trailersfree 6 Jan
LivestockSkelFlat topRoad train dollyCross loaderEarthmoving After the customer's date Overlaps another build
Check a build
Dozer Safety Mod PackRT-EMSM · 3 working days
Bay 3 · 30 Nov → 2 Dec
Finishes 3 working days after they want it (27 Nov 2026). Bay 3 is free from 30 Nov 2026.
Bay 3: 30 Nov → 2 Dec (+3 d)Bay 1: 9 Dec → 11 Dec (+10 d)Bay 2: 6 Jan → 8 Jan (+30 d)
9 of 9 BOM lines on the rack. Material $3,426.
All 9 BOM lines
| Part | Need | Free | On order | Status |
|---|---|---|---|---|
| Trailer wiring loom kit — 7-pin EL-LOOM | 1 | 2 | 0 | On the rack |
| LED crate work light EL-WORK | 4 | 12 | 0 | On the rack |
| M16 HT bolt & nut — box of 50 FS-M16 | 1 | 10 | 0 | On the rack |
| MIG wire 0.9 mm — 15 kg CN-MIG09 | 1 | 16 | 0 | On the rack |
| Zinc-rich primer — 20 L PT-PRIMER | 1 | 6 | 0 | On the rack |
| 2-pack polyurethane topcoat — 20 L PT-TOPCOAT | 1 | 7 | 0 | On the rack |
| 3 mm checker plate — 2400×1200 PL-CHK3 | 2 | 9 | 0 | On the rack |
| 100×50×4.0 RHS — 8 m ST-RHS10050 | 4 | 22 | 0 | On the rack |
| 50×50×3.0 SHS — 8 m ST-SHS5050 | 6 | 8 | 60 | On the rack |