- Bay
- Bay 3
- Build
- 28 Oct 2026 → 05 Nov 2026
- Customer date
- 10 Nov 2026 — on track
- Assigned
- —
Scheduled
Cut & fold
Chassis fab
Body / crate
Blast & paint
Fit-off
Compliance & QA
Complete
iPin centres to suit their D7R — Dale to send measurements.
Bill of materials · 12 lines, 12 reserved, 1 short
| Part | Qty | On hand | All jobs need | On order | Status | Cost |
|---|---|---|---|---|---|---|
| Cutting & flap discs — box CN-DISCS · Downs Bolt & Fastener | 1 box | 27 | 18 | 0 | On the rack | $65 |
| Argoshield bottle exchange CN-GAS · Downs Bolt & Fastener | 2 bottle | 30 | 23 | 0 | On the rack | $156 |
| MIG wire 0.9 mm — 15 kg CN-MIG09 · Downs Bolt & Fastener | 3 spool | 50 | 34 | 0 | On the rack | $288 |
| Garnet blast media — 25 kg PT-GARNET · Dulux Protective Coatings | 3 bag | 122 | 70 | 0 | On the rack | $102 |
| Zinc-rich primer — 20 L PT-PRIMER · Dulux Protective Coatings | 1 pail | 24 | 18 | 0 | On the rack | $290 |
| 2-pack polyurethane topcoat — 20 L PT-TOPCOAT · Dulux Protective Coatings | 1 pail | 25 | 18 | 0 | On the rack | $420 |
| Pin & bush kit — earthmoving EM-PINKIT · Downs Bolt & Fastener | 1 kit | 4 | 1 | 0 | On the rack | $420 |
| Ripper shank — D6/D7 EM-SHANK · Bisalloy Steels | 3 ea | 4 | 3 | 0 | On the rack | $6,450 |
| Ripper tip & boot EM-TIP · Bisalloy Steels | 3 ea | 9 | 3 | 0 | On the rack | $555 |
| 16 mm plate — 2400×1200 PL-16 · Infrabuild Steel Centre — Toowoomba | 2 sheet | 16 | 11 | 0 | On the rack | $1,300 |
| Bisalloy 80 wear plate 20 mm — 2400×1200 PL-BIS20 · Bisalloy Steels | 3 sheet | 2 | 3 | 3 | On order | $4,440 |
| 150×50×5.0 RHS — 8 m ST-RHS15050 · Infrabuild Steel Centre — Toowoomba | 2 length | 64 | 48 | 0 | On the rack | $520 |
Purchase orders for this job
Margin (estimate)
- Price ex GST
- $29,000
- Material
- $15,006
- Labour
- $5,890 · 95 h est, 6 h so far
- Margin
- $8,104 · 28%
Invoices